The Problem:

How to get this beautiful faucet

attached to the pipe in the floor (when the risers Bruce bought have bolts too tall for the subfloor)
Answer: have to wait for new pieces to be built and pray they work!

Meanwhile, Cam works on other things:

Drywall and plastering

Dryall and plaster for the south wall (to be tiled halfway up)

Window frame done with high quality laminated pine

entry door installed, 3 hinges, and Weiser lever-handles, lockable

Sliding door, surrounding drywall and plaster

Wiring and breaker (unseen) for the convection heater

Laundry-wall; Stovepipe for the dryer

Plumbing for the pedestal sink